leading integrated metal parts optimal

solution intelligence partner

News
News

The company establishes a dedicated project team and discusses different technical issues with foreign engineers
2025/01/11

1.jpg


These spare parts are assembled on a 154 meter high building of the Abu Dhabi Investment Commission in Dubai. When the sun shines directly, it can fully unfold, and as the sun deviates, it reduces the unfolded area by adjusting the angle. With such a shading system, people can adjust the internal light and temperature according to changes in the building's external environment. Due to the silkworm pupa shape of the entire building, the size, angle, and support rod size of each sunshade are different, which increases the difficulty of processing.


The company established a dedicated project team and discussed different technical issues with foreign engineers, ultimately overcoming various technical difficulties and making the project a complete success. The technology of this shading system, combined with the geographical environment of the Dubai Bay area, is being used for the first time in the world and can reduce the overall energy consumption and carbon dioxide emissions of the entire building. According to reports, the steel processing standards and precision of the parts have exceeded aviation grade, and the construction difficulty of this curtain wall has been listed as the third largest difficulty in the world in the construction industry.

Contact

Address:Changtang No.2 Industrial Park, Baihua Town Huidong County, Huizhou City, Guangdong Province, China

Tel:0752-8785338  8785488

Email:vincent@jbcasting.com

Scan WeChat

Copyright Huizhou Jibang Precision Technology Co., Ltd.